Fill us in Phil : Greenwood Apartments 12/2020

Episode 04 : All about Gypsum Concrete Flooring Prep Great flooring in an apartment building starts with pouring gypsum concrete throughout the building. In Episode 04 of Fill us in Phil, Senior Superintendent Phil Wheeler discusses the process and its many benefits at our Greenwood Apartments…

Read "Fill us in Phil : Greenwood Apartments 12/2020"


Fill us in Phil : Greenwood Apartments 10/2020

Episode 03 : The Tower Crane Episode Have you ever wondered how a tower crane on a construction site is assembled/disassembled? Well, wonder no more! In Episode 03 of Fill us in Phil, Senior Superintendent Phil Wheeler walks you through the process at our Greenwood Apartments project.

Read "Fill us in Phil : Greenwood Apartments 10/2020"


Newsletter

Subscribe to the Rafn newsletter for a quarterly digest of our posts.

Subscribe

Photo Stream

  • Hospitality on the Horizon Event Recap
  • Project Tour : AMLI Wallingford South Building
  • Project Tour : Green Lake Apartments
  • Enforcing ADA Standards Part 2 : Hotspots
  • PSBJ Top 100 Workplaces in Washington
  • BIM for Site Work and Utilities Analysis
  • The Lean Methodology of Project Scheduling
  • What to Consider when Considering Phased Occupancy