Small

 UCDS EDGe & Teachers Nook

The University Child Development School designs a culture of inquiry essential to meaningful learning and as such often finds itself needing to reconfigure their spaces to suit this pursuit.

For this particular summer project, Rafn was called to reconfigure spaces within the building for new uses as well as to add to an existing space to create a teacher’s nook.

The Engineering and Design Garage (EDGe) is a newly configured classroom space previously used as staff offices that features a steel grated mezzanine specifically designed for science experiments and a repurposed glass wall. A spiral metal staircase provides access to the mezzanine which includes a hoist above an access panel in the floor, sturdy metal railings, and ceiling mounted electric receptacles to keep the floor area clear. The steel sash windows of the glass wall previously served in the school’s boiler room but now create a view into the EDGe from the interior of the building. The old science room was reconfigured as new staff offices.

The other major component of work on the project was the creation of a new “box on a stick” concept teacher’s nook. Rafn seamlessly integrated this new 2nd level space with the existing 2nd level walkway for the illusion a box mounted on a stick from below and a floating stair to access it. This small addition was challenging due to the various angles and multiple levels involved but the finished product is true to the visionary design intent.

Location
Seattle, WA
Year
2013
Client
University Child Development School
Architect
Carlson Architects
Photos
Rafn Company

Related Projects

HomeStreet Bank Tacoma

This project is a new ground up bank branch and lending office building in Tacoma for HomeStreet Bank.

See the Project

Leisure Care

Rafn performed several occupied renovation projects in Leisure Care’s senior living facilities in 2016 and 2017.

See the Project

 Theo Chocolate Factory

Converting the Seattle Landmark Trolley Barn from its most recent use as a brewery into a chocolate processing facility was not as simple as it sounds. The biggest hurdle proved to be the budget – which more than once nearly derailed the project. Rafn researched numerous options to find the most cost effective solutions for every portion of the work.

See the Project